2780 live leads · 55 new today · updated 19 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Ethiopia

Pre-qualification / EOI

Design review and construction supervision of Awadi Geberoch climate-resilient diversion irrigation and drainage scheme – EOI ET-AFR-RPCU-569666-CS-QCBS (World Bank LLRP II)

تأهيل مسبق – Ethiopia

Irrigation and water-resources supervision consultants can express interest in a 10-month supervision assignment for a diversion scheme in Afar, Ethiopia.

TypePre-qualification / EOI
StatusOpen – closes 30 Nov 2026 (11 days)
CountryEthiopia · Argoba Woreda (Afar)
Client / ownerLowlands Livelihood Resilience Project II – Afar Regional Project Coordination Unit
Announced13 Nov 2026
Deadline30 Nov 2026
Project typeWater, desalination & treatment

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Pre-qualification / EOIMozambiqueOpen – closes 18 Dec 2026 (29 days)

Climate vulnerability assessment along the Nacala Corridor and supervision of civil works (FIDIC Engineer), 45A000141/CP/05/2026 (World Bank EOI)

Client: Transport Corridors for Economic Resilience Mozambique SOP 2 Project (TRACER SOP2) – Ministry of Transport and Logistics

Pre-qualification / EOIColombiaCOP 20trnOpen – deadline not published

ANI concession pipeline for 2027 tendering – El Dorado Max airport expansion (COP 13trn, 45→73M pax), new Cartagena (Bayunca) airport (COP 6.13trn, 30-yr), Conexión Centro 5G road and Perimetral de la Sabana

Client: Agencia Nacional de Infraestructura (ANI) – private initiatives originated by Odinsa

Contract awardUnited StatesUSD 150M (ceiling, up to USD 300M with options)Contract awarded – subcontracting open

MWAA program management support task-order contracts (5 yrs + options) for Dulles USD 20bn+ redevelopment and Reagan National Terminal 1 replacement / South Area – planning, oversight, controls, construction management

Awarded to Jacobs Project Management Co.; TYLin International · Client: Metropolitan Washington Airports Authority (MWAA)

Pre-qualification / EOIArmeniaOpen – closes 15 Dec 2026 (26 days)

Feasibility study, designs, bidding documents and technical supervision for irrigation systems (Kotayk, Lori, Arzni-Shamiram, Lower Hrazdan incl. Ranchpar pumping stations & pressure pipelines, Debetavan), AM-WC-CS-03/1 (World Bank EOI)

Client: Armenia Water and Irrigation Services Enhancement Program – Phase 1 – Water Committee, Ministry of Territorial Administration and Infrastructure

Pre-qualification / EOITurkeyOpen – closes 07 Dec 2026 (18 days)

Mersin M2:3 rail system line (9.93 km, 11 tram stations, Ocak Kent Meydanı–Şehir Hastanesi–Meşot) – design review, construction supervision & consultancy, prequalification (İKN 2026/2207797)

Client: Mersin Metropolitan Municipality – Transportation Department

Want more leads like this?Get Project management & construction supervision, Structural & civil design opportunities in your inbox every morning.
Get free alerts →