Design, supply & installation of 66 kV sub-transmission line Kenema–Kailahun and associated Kailahun substation – SL-EDSA-502236-CW-RFB, 16 months (World Bank)
ترسية عقد – Sierra Leone
Tower steel, conductor, transformer and switchgear suppliers plus line-stringing and civil subcontractors should engage First Atlantic Industries on this USD 11.4M Kenema–Kailahun 66 kV line and substation EPC.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Sierra Leone · Kenema / Kailahun |
| Client / owner | Enhancing Sierra Leone Energy Access project (P171059) – Electricity Distribution and Supply Authority (EDSA) |
| Awarded to | First Atlantic Industries (China) |
| Value | USD 11.37M |
| Announced | 06 Nov 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Structural steel fabrication & erection
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- Electrical & instrumentation (E&I) installation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.