DK58 bridge replacement at Janowo – 11 bids opened, lowest Strabag PLN 5.14M (budget PLN 5.48M)
تأهيل مسبق – Poland
Small GDDKiA bridge rebuild with temporary crossing over 12 months; Strabag is the only bid within budget, so precast, demolition and formwork suppliers should contact it.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Poland · Janowo (Szczytno) |
| Client / owner | GDDKiA Olsztyn branch |
| Value | PLN 5.5M |
| Announced | 13 Nov 2026 |
| Project type | Bridges & tunnels, Roads & highways |
Trades and packages needed
- Bridge & flyover construction (main package)
- Demolition & dismantling (main package)
- Concrete works (in-situ) (main package)
- Rebar cutting, bending & fixing
- Precast & prestressed concrete
- Roads, asphalt paving & road marking
- Piling & deep foundations
What to do
Early stage – get on the client's or bidders' vendor lists now.