DOE first natural gas power auction – 3,800 MW mid-merit CCGT capacity (Luzon 2,900 MW, Visayas 940 MW); 10 firms prequalified/interested, bid deadline moved to Q1 2027
تأهيل مسبق – Philippines
Prequalified gas-to-power groups (Prime Infra, LNGPH/San Miguel-Aboitiz-Meralco and others) will need CCGT EPC, gas-supply and grid-connection partners for new Batangas, Iloilo and Visayas plants.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Philippines · Luzon / Visayas |
| Client / owner | Department of Energy (Philippines) |
| Announced | 09 Oct 2026 |
| Project type | Power plants & renewables, Oil, gas & petrochemical plants |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- MV/HV substations & transmission lines (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Concrete works (in-situ)
- Piling & deep foundations
- Structural steel fabrication & erection
- MEP & process design engineering
What to do
Early stage – get on the client's or bidders' vendor lists now.