DOE Green Energy Auction 7 (GEA-7) – proposed 550 MW run-of-river & impounding hydro and ~2,000 MW solar; TOR end-Oct/early Nov 2026, auction Mar 2027
تأهيل مسبق – Philippines
Philippine DOE plans a 2027 renewables auction with ~550 MW hydro and ~2 GW solar (registration Dec 2026); hydro/solar developers, EPC contractors and feasibility consultants should prepare bids and partnerships.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Philippines · Mindanao / Luzon / Visayas |
| Client / owner | Department of Energy (DOE), Philippines |
| Announced | 16 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Solar PV & battery storage (main package)
- Mechanical erection & equipment installation
- Concrete works (in-situ)
- MV/HV substations & transmission lines
- Structural & civil design
- Land surveying & geotechnical investigation
What to do
Early stage – get on the client's or bidders' vendor lists now.