Dongde Energy 100,000 tpy e-SAF project with 50,000 tpy green hydrogen and 2 GW wind – construction start
ترسية عقد – China
Process equipment, electrolyser, piping and E&I suppliers should approach Dongde Energy for packages on this USD 1.6bn power-to-liquids complex in Xinjiang.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | China · Yiwu county, Xinjiang |
| Client / owner | Dongde Energy |
| Value | USD 1.6bn |
| Announced | 01 Oct 2026 |
| Project type | Oil, gas & petrochemical plants, Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Pressure vessels, tanks & heat exchangers (main package)
- Electrical & instrumentation (E&I) installation (main package)
- MV/HV substations & transmission lines
- Concrete works (in-situ)
- Structural steel fabrication & erection
- Heavy lifting, rigging & transport
- NDT, inspection & certification
What to do