2780 live leads · 55 new today · updated 19 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Turkey

Pre-qualification / EOI

DSİ 5th Region – Çamlıdere Dam to İvedik WTP stage 2 drinking-water tunnel: design/application project consultancy prequalification (İKN 2026/1816931)

تأهيل مسبق – Turkey

Tunnel and water-conveyance design consultancies with Turkish references should prequalify by 19 Oct for DSİ's Çamlıdere drinking-water tunnel design contract (3–10 firms to be shortlisted).

TypePre-qualification / EOI
StatusClosed 19 Oct 2026
CountryTurkey · Ankara
Client / ownerDSİ 5th Regional Directorate (State Hydraulic Works), Ankara
Announced02 Oct 2026
Deadline19 Oct 2026
Project typeWater, desalination & treatment, Bridges & tunnels

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Pre-qualification / EOIEthiopiaOpen – closes 02 Dec 2026 (13 days)

Feasibility study and detailed design for Weito pumped small-scale irrigation scheme (100 ha), Kolango-Zuriya Woreda, ET-SE-RPCU-571071-CS-QCBS (World Bank EOI)

Client: Lowlands Livelihood Resilience Project, Phase Two (LLRP II) – South Ethiopia Irrigation and Lowlands Development Bureau

Pre-qualification / EOIEthiopiaOpen – closes 02 Dec 2026 (13 days)

Feasibility study and detailed design of 4 gravel access roads (~97 km) and 3 bridges (~130 m), South Ethiopia Region, ET-SE-RPCU-571226-CS-QCBS (World Bank EOI)

Client: Lowlands Livelihood Resilience Project, Phase Two (LLRP II) – South Ethiopia Irrigation and Lowlands Development Bureau

Open tenderOman · عُمانOpen – closes 07 Dec 2026 (18 days)

Omran tender 41/2026 – design & development consultancy for enhancement of the Al Hoota Cave destination (global, two-envelope)

Client: Omran Group (Oman Tourism Development Company)

Pre-qualification / EOIKenyaOpen – deadline not published

KenGen Marsabit wind farm – 200 MW first phase of planned 1,000 MW project, AFD-funded feasibility study (EUR 0.64M grant) under way

Client: Kenya Electricity Generating Company (KenGen)

Pre-qualification / EOIArmeniaOpen – closes 15 Dec 2026 (26 days)

Feasibility study, designs, bidding documents and technical supervision for irrigation systems (Kotayk, Lori, Arzni-Shamiram, Lower Hrazdan incl. Ranchpar pumping stations & pressure pipelines, Debetavan), AM-WC-CS-03/1 (World Bank EOI)

Client: Armenia Water and Irrigation Services Enhancement Program – Phase 1 – Water Committee, Ministry of Territorial Administration and Infrastructure

Want more leads like this?Get Structural & civil design, Land surveying & geotechnical investigation opportunities in your inbox every morning.
Get free alerts →