Dunărea East 292.5 MW wind farm – project financing up to EUR 367M closed (EBRD and commercial banks), COD early 2029
ترسية عقد – Romania
Wind BOP contractors – foundations, access roads, substation, cabling and crane hire – should approach Rezolv Energy now that financing for the 292.5 MW Dunărea East project is in place.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Romania · Constanța County |
| Client / owner | Rezolv Energy |
| Awarded to | Rezolv Energy (developer) |
| Value | EUR 367M (financing) |
| Announced | 06 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Concrete works (in-situ) (main package)
- Earthworks, excavation & site grading (main package)
- MV/HV substations & transmission lines (main package)
- Heavy lifting, rigging & transport (main package)
- Cables, switchgear & electrical materials
- Roads, asphalt paving & road marking
- Equipment & crane rental
- Ready-mix concrete, cement & aggregates
- Electrical & instrumentation (E&I) installation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.