Dunarea East 292.5 MW wind farm – EBRD loan up to EUR 31.9M within EUR 367M financing package
تأهيل مسبق – Romania
BOP civil, foundations, substation and cabling contractors in Romania should approach Rezolv Energy now that financing for the 292.5 MW Dunarea East wind farm is in place.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Romania · Constanța |
| Client / owner | Rezolv Energy |
| Value | EUR 367M |
| Announced | 14 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Heavy lifting, rigging & transport (main package)
- Concrete works (in-situ) (main package)
- MV/HV substations & transmission lines (main package)
- Roads, asphalt paving & road marking
- Electrical & instrumentation (E&I) installation
- Cables, switchgear & electrical materials
- Equipment & crane rental
What to do
Early stage – get on the client's or bidders' vendor lists now.