Eagle Mountain wastewater treatment plant expansion – new 6-MGD MBR train, headworks, BNR basins, membrane building, sludge & dewatering; CMAR in six GMP packages (groundbreaking 23 Oct)
ترسية عقد – United States
Concrete, process-piping, electrical/SCADA and earthworks subcontractors and membrane/pump suppliers can approach CMAR MGC Contractors, which is releasing the remaining GMP packages for this USD 120M plant expansion.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United States · Eagle Mountain, Utah |
| Client / owner | City of Eagle Mountain |
| Awarded to | MGC Contractors Inc. (CMAR); AE2S Engineering (design) |
| Value | USD 120M |
| Announced | 26 Oct 2026 |
| Project type | Wastewater & sewage |
Trades and packages needed
- Water & wastewater treatment equipment (main package)
- Earthworks, excavation & site grading (main package)
- Concrete works (in-situ) (main package)
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
- Electrical installation (LV)
- HVAC, pumps & mechanical equipment supply
- Pipes, valves & fittings supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.