Eastern Green Link 3 (EGL3, 2 GW HVDC Scotland–England) – southern converter station civil works at Walpole, Norfolk; BAM also holds ECI for Peterhead converter
ترسية عقد – United Kingdom
Earthworks, drainage, piling, concrete and steel-building subcontractors can approach BAM for civils packages at the EGL3 converter station site ahead of 2028 construction.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United Kingdom · Walpole, Norfolk |
| Client / owner | National Grid Electricity Transmission / SSEN Transmission |
| Awarded to | BAM UK & Ireland (designer: Mott MacDonald) |
| Announced | 09 Nov 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- Earthworks, excavation & site grading (main package)
- Concrete works (in-situ) (main package)
- Storm-water drainage & culverts (main package)
- Piling & deep foundations
- Roads, asphalt paving & road marking
- Structural steel fabrication & erection
- Pre-engineered & modular buildings
- Electrical installation (LV)
- Land surveying & geotechnical investigation
- Ready-mix concrete, cement & aggregates
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.