Eastern mining railway (Annaba–Djebel Onk line and Bled El-Hadba branch) – signalling, telecoms and electrification contracts (~USD 1bn)
خط السكة الحديدية المنجمي الشرقي (عنابة – جبل العنق وفرع بلاد الحدبة) – عقود الإشارات والاتصالات والكهربة (نحو مليار دولار)
Catenary, traction-substation, signalling-cable and telecom subcontractors should approach the systems contractors on Algeria's ~USD 1bn eastern mining rail award.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Algeria · Annaba – Djebel Onk / Bled El-Hadba |
| Client / owner | Algerian rail authorities (Anesrif) |
| Value | ~USD 1bn |
| Announced | 06 Nov 2026 |
| Project type | Rail & metro, Substations & transmission grids |
Trades and packages needed
- Railway track & systems installation (main package)
- MV/HV substations & transmission lines (main package)
- ELV, ICT & security systems (CCTV, access, cabling) (main package)
- Cables, switchgear & electrical materials (main package)
- BMS, controls & SCADA
- Concrete works (in-situ)
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.