Ekibastuz 'Data Center Valley' – Phase 1 three data centres (68 MW, 164 MW Firebird AI, 72 MW) under construction; Phase 2 480–620 MW in preliminary agreements
تأهيل مسبق – Kazakhstan
Data-centre MEP, cooling, power and fit-out contractors: Kazakhstan's 1 GW-by-2029 Ekibastuz data centre cluster has Phase 1 under construction and Phase 2 deals in negotiation.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Kazakhstan · Ekibastuz (Pavlodar region) |
| Client / owner | Kazakhtelecom |
| Announced | 06 Nov 2026 |
| Project type | Data centres, Substations & transmission grids |
Trades and packages needed
- HVAC & ventilation (main package)
- Electrical installation (LV) (main package)
- MV/HV substations & transmission lines (main package)
- Generators, UPS & standby power (main package)
- ELV, ICT & security systems (CCTV, access, cabling) (main package)
- District cooling & chilled-water plants
- Fire protection & fire alarm
- BMS, controls & SCADA
- Pre-engineered & modular buildings
- Structural steel fabrication & erection
- Concrete works (in-situ)
What to do
Early stage – get on the client's or bidders' vendor lists now.