El Dabaa nuclear plant grid connection – 500 kV double-circuit OHL loop-in (15 months)
السويدي إليكتريك – ربط محطة الضبعة النووية بالشبكة القومية بخط جهد 500 ك.ف
Transmission-line subcontract work – tower erection, stringing and foundations.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Egypt · El Dabaa |
| Client / owner | Egyptian Electricity Transmission Company |
| Awarded to | Elsewedy Electric |
| Announced | 29 Sep 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Structural steel fabrication & erection
- Cables, switchgear & electrical materials
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.