El-Menzel 362 MW pumped-storage hydropower station (EPC + operation) – ONEE bid deadline extended to 25 November
محطة الضخ والتخزين الكهرومائية المنزل بقدرة 362 ميغاواط (هندسة وتوريد وإنشاء وتشغيل) – تمديد موعد العطاءات إلى 25 نوفمبر
Hydro EPC contractors and electromechanical OEMs now have until 25 November to bid ONEE's IsDB-financed El-Menzel pumped-storage plant.
| Type | Open tender |
|---|---|
| Status | Open – closes 25 Nov 2026 (34 days) |
| Country | Morocco · Séfrou (Fès-Meknès) |
| Client / owner | Office National de l'Électricité et de l'Eau Potable (ONEE) |
| Announced | 15 Oct 2026 |
| Deadline | 25 Nov 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Tunnelling & microtunnelling (main package)
- Concrete works (in-situ) (main package)
- Earthworks, excavation & site grading (main package)
- Mechanical erection & equipment installation (main package)
- MV/HV substations & transmission lines (main package)
- Electrical & instrumentation (E&I) installation
What to do
Register with the client and request the tender documents before the deadline.