Eneva LNG regasification terminal at Port of Pecém – floating unit up to 14 MMm³/d to supply Ceará thermal plants from the March capacity auction
تأهيل مسبق – Brazil
New FSRU-based LNG terminal in Ceará: marine contractors, cryogenic piping, loading-arm and valve suppliers should approach Eneva early.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Brazil · Pecém (Ceará) |
| Client / owner | Eneva |
| Value | USD 80M |
| Announced | 16 Oct 2026 |
| Project type | Oil, gas & petrochemical plants, Ports, harbours & marine works |
Trades and packages needed
- Marine works, dredging & reclamation (main package)
- Process piping fabrication & welding (main package)
- Pipeline construction
- Mechanical erection & equipment installation
- Pipes, valves & fittings supply
- Electrical & instrumentation (E&I) installation
- Industrial hot & cold insulation
- NDT, inspection & certification
What to do
Early stage – get on the client's or bidders' vendor lists now.