Eraring battery precinct expansion – 500 MW / 4,942 MWh (8-hour) BESS, EPBC referral; construction from 2028
تأهيل مسبق – Australia
BESS integrators, EPC contractors and HV connection specialists should track this long-duration storage expansion now entering approvals.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Australia · Eraring, NSW Central Coast |
| Client / owner | Origin Energy |
| Announced | 06 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
What to do
Early stage – get on the client's or bidders' vendor lists now.