EWA consultancy for Khalifa City housing project transmission network – two new 66 kV substations (design, tendering, contract management, supervision): 2 bids opened, lowest BHD 493,680 (AtkinsRéalis)
استشارات هيئة الكهرباء والماء لشبكة نقل الكهرباء لمشروع مدينة خليفة الإسكاني – محطتان فرعيتان جديدتان 66 ك.ف (تصميم وطرح ومناقصات وإدارة عقود وإشراف): فتح عطاءين وأقل عطاء 493,680 دينار (AtkinsRéalis)
Signals two new 66 kV substation EPC tenders to follow for Khalifa City; substation contractors and switchgear/transformer suppliers should track EWA's next stage.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Bahrain · Khalifa City |
| Client / owner | Electricity and Water Authority (EWA), Bahrain – Planning and Studies |
| Value | BHD 0.49M |
| Announced | 21 Oct 2026 |
| Project type | Substations & transmission grids, Villas & housing communities |
Trades and packages needed
- MEP & process design engineering (main package)
- Project management & construction supervision (main package)
- MV/HV substations & transmission lines (main package)
- Structural & civil design
What to do
Early stage – get on the client's or bidders' vendor lists now.