EWA Electricity Transmission – prequalification for measured term contracts: cables, 11 kV switchgear and substation maintenance (Tender Board 557/2026/BTB)
هيئة الكهرباء والماء – التأهيل المسبق لعقود الأعمال المقاسة لنقل الكهرباء: الكابلات ومفاتيح 11 ك.ف وصيانة المحطات الفرعية (557/2026/BTB)
Multi-year call-off work on Bahrain's transmission network; local cable-laying, jointing and switchgear-maintenance contractors should submit prequalification by 30 Dec.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – closes 30 Dec 2026 (41 days) |
| Country | Bahrain |
| Client / owner | Electricity and Water Authority (EWA), Bahrain |
| Announced | 16 Nov 2026 |
| Deadline | 30 Dec 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Electrical installation (LV)
- Earthworks, excavation & site grading
- Water, sewer & utility networks (incl. HDD)
What to do
Early stage – get on the client's or bidders' vendor lists now.