Export-oriented low-carbon fuels plant (50,000 t/yr phase 1, up to 400,000 t/yr in 3 phases) – Go Energy & Clean Energy Co/SARCO alliance, engineering design started, operation targeted Q1 2029
مصنع وقود منخفض الكربون موجّه للتصدير (50 ألف طن سنوياً في المرحلة الأولى حتى 400 ألف طن على 3 مراحل) – تحالف جو إنرجي وشركة الطاقة النظيفة/ساركو، بدء التصميم الهندسي والتشغيل المستهدف الربع الأول 2029
Process licensors, FEED/engineering firms and EPC contractors should engage early with Go Energy and SARCO while design and feasibility work is under way.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Saudi Arabia |
| Client / owner | Go Energy Group / Clean Energy Co (Ethraa Group) with SARCO |
| Announced | 23 Oct 2026 |
| Project type | Oil, gas & petrochemical plants, Factories & industrial plants |
Trades and packages needed
- MEP & process design engineering (main package)
- Structural & civil design
- Project management & construction supervision
- Pressure vessels, tanks & heat exchangers
- Process piping fabrication & welding
- Mechanical erection & equipment installation
- Electrical & instrumentation (E&I) installation
What to do
Early stage – get on the client's or bidders' vendor lists now.