Feasibility study for navigation and port/landing infrastructure on Lake Chad and the Chari and Logone rivers, 12 months (World Bank EOI)
تأهيل مسبق – Chad
Transport and marine engineering consultancies can submit an EOI for this inland waterway feasibility study covering dredging, signage and landing infrastructure.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – closes 09 Nov 2026 (15 days) |
| Country | Chad · N'Djamena |
| Client / owner | Chad Connectivity and Integration Project – Ministry of Transport, Civil Aviation and National Meteorology |
| Announced | 23 Oct 2026 |
| Deadline | 09 Nov 2026 |
| Project type | Ports, harbours & marine works |
Trades and packages needed
- Structural & civil design (main package)
- Land surveying & geotechnical investigation (main package)
What to do
Early stage – get on the client's or bidders' vendor lists now.