Fertiglobe 1.3 Mtpa diammonium phosphate (DAP) fertilizer complex – feasibility studies under way (USD 1.5B+, operations targeted 2031)
مجمع فيرتيجلوب لإنتاج سماد فوسفات ثنائي الأمونيوم بطاقة 1.3 مليون طن سنوياً في العين السخنة – دراسات الجدوى جارية (أكثر من 1.5 مليار دولار، التشغيل المستهدف 2031)
Process-engineering consultants, FEED contractors and site-investigation firms should engage Fertiglobe early on its planned Ain Sokhna DAP complex while feasibility work is ongoing.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Egypt · Ain Sokhna |
| Client / owner | Fertiglobe |
| Value | USD 1.5B |
| Announced | 18 Oct 2026 |
| Project type | Factories & industrial plants, Oil, gas & petrochemical plants |
Trades and packages needed
- MEP & process design engineering (main package)
- Structural & civil design
- Project management & construction supervision
- Land surveying & geotechnical investigation
- Mechanical erection & equipment installation
- Process piping fabrication & welding
- Pressure vessels, tanks & heat exchangers
- Structural steel fabrication & erection
What to do
Early stage – get on the client's or bidders' vendor lists now.