Five interconnected solar mini-grids, 17.7 MW + 17.74 MWh BESS (Bola, Jiboye, Molade-Adelubi, Ogo Oluwa, Sooko-Elega) – groundbreaking
ترسية عقد – Nigeria
Construction launched on 17.7 MW of mini-grids with battery storage across five Oyo LGAs – PV, BESS, MV/LV distribution and metering suppliers should engage developer Paras Energy.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Nigeria · Ibadan (Oyo State) |
| Client / owner | Federal Government of Nigeria / Rural Electrification Agency (World Bank-financed) |
| Awarded to | Paras Energy and Natural Resources Development Ltd (developer) |
| Announced | 16 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- Cables, switchgear & electrical materials (main package)
- Electrical installation (LV) (main package)
- MV/HV substations & transmission lines
- BMS, controls & SCADA
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.