Five standalone BESS IPPs – 950 MW / 3,800 MWh (Sohar 500 MW/2,000 MWh; Al-Mabellah, Ayjah, Sadah 100 MW each; Jalan Bani Bu Ali 150 MW) – developers preparing bids after deadline extension
خمسة مشاريع مستقلة لتخزين الطاقة بالبطاريات – 950 ميغاواط / 3,800 ميغاواط ساعة (صحار وال معبيلة وعيجة وصادح وجعلان بني بو علي) – المطورون يعدون عطاءاتهم بعد تمديد الموعد
Battery integrators, EPC contractors and 132/220 kV substation suppliers should team with developers bidding Nama PWP's five-site, 950 MW storage round.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Oman · Sohar, Al-Mabellah, Ayjah, Jalan Bani Bu Ali, Sadah |
| Client / owner | Nama Power & Water Procurement Company (Nama PWP) |
| Announced | 12 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Electrical installation (LV)
- BMS, controls & SCADA
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- Fire protection & fire alarm
What to do
Early stage – get on the client's or bidders' vendor lists now.