Future Highway 413 – two bridges carrying Highway 10 and Bovaird Drive over the new highway, plus Bovaird Drive widening and grade separation (Heritage Rd–Mississauga Rd); construction started
ترسية عقد – Canada
Precast girder, rebar, ready-mix, paving and traffic-control suppliers should contact Bot Construction on the first Highway 413 bridge contracts.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Canada · Brampton / Caledon, Ontario |
| Client / owner | Ontario Ministry of Transportation |
| Awarded to | Bot Construction Limited |
| Announced | 16 Nov 2026 |
| Project type | Bridges & tunnels, Roads & highways |
Trades and packages needed
- Bridge & flyover construction (main package)
- Concrete works (in-situ) (main package)
- Precast & prestressed concrete (main package)
- Rebar cutting, bending & fixing (main package)
- Formwork & falsework (main package)
- Earthworks, excavation & site grading (main package)
- Roads, asphalt paving & road marking (main package)
- Ready-mix concrete, cement & aggregates (main package)
- Piling & deep foundations
- Storm-water drainage & culverts
- Site security & traffic management
- Steel, rebar & structural sections supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.