Generation Steel electric arc furnace steel mill, Collie (450,000 t/yr rebar) – AUD 850M plan advances with BHP renewable PPA
تأهيل مسبق – Australia
Industrial EPC, steel-structure and electrical contractors in WA should engage Generation Steel early on design and construction of Australia's first new steel mill in 35 years.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Australia · Collie, WA |
| Client / owner | Generation Steel (formerly Green Steel WA) |
| Value | AUD 850M |
| Announced | 25 Oct 2026 |
| Project type | Factories & industrial plants |
Trades and packages needed
- Structural steel fabrication & erection (main package)
- Concrete works (in-situ) (main package)
- Mechanical erection & equipment installation (main package)
- Electrical & instrumentation (E&I) installation (main package)
- MV/HV substations & transmission lines
- Refractory works
- Pre-engineered & modular buildings
- MEP & process design engineering
What to do