Gioia Tauro port – cold ironing phase 2 (second substation, 160 MW system) and channel dredging to -17 m
ترسية عقد – Italy
Transformer, switchgear, shore-power cable and dredging-support suppliers should contact the Saet–Suardi JV and Dravo on these EUR 35M port electrification and dredging works.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Italy · Gioia Tauro, Calabria |
| Client / owner | Port System Authority of Gioia Tauro |
| Awarded to | Saet Spa – Suardi Spa (cold ironing); Dravo (dredging) |
| Value | EUR 35M |
| Announced | 02 Oct 2026 |
| Project type | Ports, harbours & marine works, Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Marine works, dredging & reclamation (main package)
- Electrical installation (LV)
- Concrete works (in-situ)
- Electrical & instrumentation (E&I) installation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.