Glenrowan solar farm hybridisation – 102 MW / ~4-hour BESS added to 130 MW solar farm, SEC extends 10-year VRET PPA; construction after financial close in 2027
تأهيل مسبق – Australia
Offtake secured for a ~400 MWh battery at an operating Victorian solar farm – BESS integrators, BoP electrical EPCs and transformer suppliers should engage before 2027 financial close.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Australia · Glenrowan, Victoria |
| Client / owner | Pacific Partnerships (CIMIC Group) / State Electricity Commission Victoria |
| Announced | 02 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Electrical & instrumentation (E&I) installation
- Concrete works (in-situ)
- BMS, controls & SCADA
What to do
Early stage – get on the client's or bidders' vendor lists now.