Google 'Project Cannoli' data center campus (282 acres) near Detroit Metro Airport – final site plan approved
تأهيل مسبق – United States
Local site, MEP, electrical and mechanical trades should register with Panattoni/Walbridge; the campus is expected to bring about USD 2bn in contracts to Wayne County firms.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | United States · Van Buren Township, MI |
| Client / owner | Google (owner/operator) |
| Parties | Panattoni (construction management) with Walbridge |
| Announced | 15 Oct 2026 |
| Project type | Data centres |
Trades and packages needed
- Earthworks, excavation & site grading (main package)
- Concrete works (in-situ) (main package)
- Structural steel fabrication & erection (main package)
- HVAC & ventilation (main package)
- Electrical installation (LV) (main package)
- Generators, UPS & standby power (main package)
- Pre-engineered & modular buildings
- Roofing & sheeting
- MV/HV substations & transmission lines
- Fire protection & fire alarm
- ELV, ICT & security systems (CCTV, access, cabling)
- BMS, controls & SCADA
- HVAC, pumps & mechanical equipment supply
- Cables, switchgear & electrical materials
What to do
Early stage – get on the client's or bidders' vendor lists now.