GPL – rebuild of ~11 km L1/L3 69 kV double-circuit overhead line Garden of Eden–Golden Grove substations (steel poles, OPGW) under IDB GY-L1066
ترسية عقد – Guyana
USD 11.4M IDB-funded 69 kV line rebuild on Guyana's East Bank signed 12 Nov – conductor, steel-pole, OPGW and foundation subcontractors can approach the CRIG–Dingli JV.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Guyana · East Bank Demerara |
| Client / owner | Guyana Power and Light Inc. (GPL) – IDB Strengthening Energy Matrix Diversification Programme |
| Awarded to | CRIG–DINGLI JV (China Railway International Group + Henan Dingli Power Equipment) |
| Value | USD 11.4M |
| Announced | 12 Nov 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Steel, rebar & structural sections supply
- Piling & deep foundations
- Concrete works (in-situ)
- Equipment & crane rental
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.