Green Energy Corridor Phase-III – intra-state transmission (INR 1.36trn) + 50 GWh BESS, approved
تأهيل مسبق – India
Transmission EPCs, substation and BESS suppliers should prepare for state-level TBCB and cost-plus tenders under this INR 1.86 trillion scheme to FY2032-33.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | India · Nationwide |
| Client / owner | Ministry of Power / State transmission utilities |
| Value | INR 1.86trn |
| Announced | 01 Oct 2026 |
| Project type | Substations & transmission grids, Power plants & renewables |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Solar PV & battery storage
- Structural steel fabrication & erection
- Concrete works (in-situ)
- BMS, controls & SCADA
What to do
Early stage – get on the client's or bidders' vendor lists now.