Group 2 battery energy storage (BESS) IPP round – six independent storage projects, 3 GW total: bid deadline extended
الجولة الثانية لمشاريع تخزين الطاقة بالبطاريات – ستة مشاريع تخزين مستقلة بإجمالي 3 جيجاواط: تمديد موعد تقديم العطاءات
Bid deadline extended for Saudi Arabia's 3 GW Group 2 BESS round – developers, BESS integrators, EPCs and HV/cable suppliers still have time to form consortia.
| Type | Open tender |
|---|---|
| Status | Open – deadline not published |
| Country | Saudi Arabia · Multiple sites |
| Client / owner | Saudi Power Procurement Company (SPPC) |
| Announced | 09 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
- Concrete works (in-situ)
What to do
Register with the client and request the tender documents before the deadline.