GSK biologics manufacturing facility, R&D pilot plant, QC lab & MSAT hub – construction start set for 2027 (demolition first)
تأهيل مسبق – United States
Pharma-capable design-builders, demolition and process-piping/HVAC contractors should position early for this USD 800M+ GSK campus buildout ahead of a 2027 start.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | United States · Upper Merion Township, PA |
| Client / owner | GSK |
| Value | USD 800M |
| Announced | 13 Oct 2026 |
| Project type | Factories & industrial plants |
Trades and packages needed
- Demolition & dismantling (main package)
- HVAC & ventilation (main package)
- Process piping fabrication & welding (main package)
- Concrete works (in-situ)
- Structural steel fabrication & erection
- Electrical installation (LV)
- BMS, controls & SCADA
- Electrical & instrumentation (E&I) installation
- MEP & process design engineering
What to do
Early stage – get on the client's or bidders' vendor lists now.