Haliba produced-water treatment facilities – design, build and operate agreement (signed at ADIPEC 2026)
منشآت معالجة المياه المصاحبة في حقل حليبة – اتفاقية تصميم وبناء وتشغيل (وُقعت في أديبك 2026)
Water treatment equipment vendors, process piping and E&I subcontractors should target Excel ASTRA for its AED 1bn Haliba produced-water DBO.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | UAE · Haliba field (Area 1), Abu Dhabi |
| Client / owner | Al Dhafra Petroleum (ADNOC / KNOC / GS Energy JV) |
| Awarded to | Excel ASTRA Engineering & Construction LLC |
| Value | AED 1bn (~USD 272M) |
| Announced | 06 Nov 2026 |
| Project type | Oil, gas & petrochemical plants, Water, desalination & treatment |
Trades and packages needed
- Water & wastewater treatment equipment (main package)
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Pressure vessels, tanks & heat exchangers
- Electrical & instrumentation (E&I) installation
- MEP & process design engineering
- Concrete works (in-situ)
- Pipes, valves & fittings supply
- HVAC, pumps & mechanical equipment supply
- Facility management & O&M services
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.