Hazelwood Battery expansion – new 150 MW / 300 MWh BESS at former Hazelwood power station (towards financial close, ~370 construction jobs)
تأهيل مسبق – Australia
BESS integrators, EPC/BOP contractors and HV connection, civil and electrical subcontractors should contact ENGIE as the 150 MW/300 MWh Hazelwood expansion moves to financial close (completion 2028).
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Australia · Hazelwood, Gippsland, Victoria |
| Client / owner | ENGIE (Hazelwood BESS Line Co) |
| Announced | 16 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- Electrical installation (LV)
- BMS, controls & SCADA
What to do
Early stage – get on the client's or bidders' vendor lists now.