2496 live leads · 53 new today · updated 10 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › India

Contract award

High-level major bridge over River Ravi at Makoura Pattan – 1,606 m (44 x 36.5 m spans) plus 4,144 m approaches (CRIF)

ترسية عقد – India

Piling, precast girder, bearing and ready-mix suppliers should approach the Brahmaputra–Gaaneshkartikey JV – 1.6 km Ravi bridge with 4.1 km approaches, 24-month build.

TypeContract award
StatusContract awarded – subcontracting open
CountryIndia · Makoura Pattan (Gurdaspur / Pathankot), Punjab
Client / ownerPunjab PWD (B&R), Construction Division Pathankot
Awarded toBrahmaputra Infrastructure Ltd – Gaaneshkartikey JV
ValueINR 897.3M (~USD 10.2M)
Announced06 Nov 2026
Project typeBridges & tunnels, Roads & highways

Trades and packages needed

What to do

The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.

Read the official source → Report a correction

Related live opportunities

Contract awardUnited StatesUSD 322MContract awarded – subcontracting open

Loop 303 extension – 4-mile freeway from Van Buren Street to MC 85 along the Cotton Lane corridor: freeway lanes, interchanges, bridges, frontage roads, lighting, signage and sound walls (pre-construction wildlife relocation complete)

Awarded to Pulice Construction (FlatironDragados) · Client: Arizona Department of Transportation (ADOT)

Open tenderUnited KingdomGBP 405MOpen – closes 18 Dec 2026 (38 days)

SWTRA Highways & Structures Framework 2027 – Lot 1 highways & structures (GBP 252M), Lot 2 resurfacing/drainage (GBP 153M), up to 8 contractors, Apr 2027–Mar 2033

Client: Neath Port Talbot CBC (with Carmarthenshire and Monmouthshire councils) for South Wales Trunk Road Agent

Contract awardUnited KingdomGBP 385MContract awarded – subcontracting open

60 Gracechurch Street, City of London – 36-storey office tower (~430,000 sq ft, 3XN), Bovis main contract cleared to start (completion Q4 2029)

Awarded to Bovis · Client: Sellar (for Obayashi Properties UK)

Pre-qualification / EOIDemocratic Republic of CongoUSD 221MOpen – deadline not published

Zongo–Bangui road bridge over the Ubangi River (Bangui–Kisangani–Kampala corridor) incl. Bangui bypass – cost revised to ~USD 221M; AfDB board in Q1 2027, works from H2 2027

Client: DRC Ministry of Infrastructure and Public Works / Government of CAR / ECCAS (AfDB, BADEA financing)

Open tenderAustraliaOpen – closes 23 Dec 2026 (43 days)

New Bridport Pier – construction of 126 m pier south of Croquet Lawn Beach (Tender 07-2026)

Client: Marine and Safety Tasmania (MAST)

Want more leads like this?Get Bridge & flyover construction, Piling & deep foundations opportunities in your inbox every morning.
Get free alerts →