Horred–Breared 70 km 400 kV overhead transmission line construction and dismantling of old line
ترسية عقد – Sweden
NCC's first package of Svenska kraftnät's 450 km Västra Götaland grid programme (completion H1 2029) – tower steel, foundations, conductor stringing, crane hire and dismantling subcontractors should contact NCC.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Sweden · Horred–Breared (Halland/Västra Götaland) |
| Client / owner | Svenska kraftnät |
| Awarded to | NCC |
| Value | SEK 1bn |
| Announced | 28 Sep 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Structural steel fabrication & erection (main package)
- Cables, switchgear & electrical materials (main package)
- Piling & deep foundations
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- Demolition & dismantling
- Equipment & crane rental
- Heavy lifting, rigging & transport
- Steel, rebar & structural sections supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.