Humain Al-Saad 100 MW AI data centre (expandable to 200 MW) – EPC tender
مناقصة أعمال الهندسة والتوريد والإنشاء لمركز بيانات الذكاء الاصطناعي في السعد بقدرة 100 ميغاواط (قابل للتوسعة إلى 200 ميغاواط) – هيوماين
EPC contractors and MEP, cooling and power subcontractors with hyperscale data-centre experience should track this ~USD 1bn Humain tender.
| Type | Open tender |
|---|---|
| Status | Open – deadline not published |
| Country | Saudi Arabia · Riyadh |
| Client / owner | Humain |
| Value | USD 1000M |
| Announced | 16 Oct 2026 |
| Project type | Data centres |
Trades and packages needed
- HVAC & ventilation (main package)
- District cooling & chilled-water plants (main package)
- MV/HV substations & transmission lines (main package)
- Generators, UPS & standby power (main package)
- Electrical installation (LV) (main package)
- ELV, ICT & security systems (CCTV, access, cabling)
- BMS, controls & SCADA
- Fire protection & fire alarm
- Concrete works (in-situ)
- Structural steel fabrication & erection