HUMAIN–DataVolt Oxagon AI data centre – ground broken on 360 MW phase 1 (campus planned 1.5 GW)
مركز بيانات للذكاء الاصطناعي في أوكساجون (هيوماين وداتافولت) – بدء أعمال المرحلة الأولى بقدرة 360 ميجاواط
Construction starting on a multi-GW AI campus at Oxagon – cooling, power, generator, ELV and data-centre fit-out suppliers should engage the developers.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Saudi Arabia · Oxagon (NEOM) |
| Client / owner | HUMAIN / DataVolt |
| Announced | 01 Oct 2026 |
| Project type | Data centres, Substations & transmission grids |
Trades and packages needed
- HVAC & ventilation (main package)
- District cooling & chilled-water plants (main package)
- Electrical installation (LV) (main package)
- MV/HV substations & transmission lines (main package)
- Generators, UPS & standby power (main package)
- Fire protection & fire alarm (main package)
- ELV, ICT & security systems (CCTV, access, cabling) (main package)
- BMS, controls & SCADA (main package)
- Cables, switchgear & electrical materials (main package)
- Pre-engineered & modular buildings
- Concrete works (in-situ)
- Solar PV & battery storage
- HVAC, pumps & mechanical equipment supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.