I-70 Kingdom City–Warrenton design-build (44 mi): third lane each direction, full-depth concrete pavement, 3 bridge replacements + 6 rehabs, Mineola Hill climbing lane, High Hill NS rail crossing redesign
ترسية عقد – United States
Paving, bridge, ready-mix, rebar and traffic-control subcontractors and suppliers should approach Millstone Weber ahead of the 2027 construction start on this 44-mile I-70 rebuild.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United States · Kingdom City–Warrenton, MO |
| Client / owner | Missouri Highways and Transportation Commission (MoDOT) |
| Awarded to | Millstone Weber (design-builder) with Jacobs (designer) and WSP |
| Value | USD 583M |
| Announced | 10 Nov 2026 |
| Project type | Roads & highways, Bridges & tunnels |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Concrete works (in-situ) (main package)
- Bridge & flyover construction (main package)
- Earthworks, excavation & site grading (main package)
- Ready-mix concrete, cement & aggregates (main package)
- Storm-water drainage & culverts
- Rebar cutting, bending & fixing
- Precast & prestressed concrete
- Steel, rebar & structural sections supply
- Equipment & crane rental
- Site security & traffic management
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.