Independent Transmission Projects (ITP) Phase I – 1,164 km of power lines & substations in 7 corridors; 7 consortia pre-qualified, RFP moved to Q2 2027
تأهيل مسبق – South Africa
Tower, conductor, substation and HV EPC suppliers should position with the seven pre-qualified consortia (Adani–Momentous, Cobra, Celeo, Okavango, State Grid, EDF, CSG) ahead of the 2027 RFP for South Africa's first private transmission lines.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | South Africa · Northern Cape, Eastern Cape, Western Cape |
| Client / owner | Department of Electricity and Energy / National Treasury – IPP Office |
| Value | USD 1bn |
| Announced | 01 Oct 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Structural steel fabrication & erection (main package)
- Cables, switchgear & electrical materials (main package)
- Earthworks, excavation & site grading
- Concrete works (in-situ)
- Land surveying & geotechnical investigation
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
- Equipment & crane rental
What to do
Early stage – get on the client's or bidders' vendor lists now.