Kalumbila–Kolwezi Interconnector (KKIP) – ~200 km, 700 MW Zambia–DRC transmission line, strategic framework agreement signed
تأهيل مسبق – Zambia
Fully permitted cross-border Copperbelt power line moving to financing and construction – transmission EPC, tower and conductor suppliers should approach the developer now.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Zambia · Kalumbila (to Kolwezi, DRC) |
| Client / owner | Enterprise Power DRC (EnPower) with FIS-RDC, Gridworks and Trafigura |
| Value | USD 300M |
| Announced | 07 Oct 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Structural steel fabrication & erection
- Earthworks, excavation & site grading
- Concrete works (in-situ)
- Land surveying & geotechnical investigation
What to do
Early stage – get on the client's or bidders' vendor lists now.