Kedah LNG regasification import terminal (up to 6 Mtpa, USD 490–735M) – FID targeted H2 2027, operations by 2030
تأهيل مسبق – Malaysia
LNG terminal FEED/EPC contractors, marine works firms and cryogenic tank/equipment suppliers should position early ahead of the 2027 investment decision.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Malaysia · Yan, Kedah |
| Client / owner | Gas Malaysia / Tokyo Gas / VTTI |
| Value | USD 735M |
| Announced | 06 Oct 2026 |
| Project type | Oil, gas & petrochemical plants, Ports, harbours & marine works |
Trades and packages needed
- Pressure vessels, tanks & heat exchangers (main package)
- Process piping fabrication & welding (main package)
- Marine works, dredging & reclamation (main package)
- Industrial hot & cold insulation (main package)
- Mechanical erection & equipment installation
- Electrical & instrumentation (E&I) installation
- Piling & deep foundations
- MEP & process design engineering
- NDT, inspection & certification
What to do
Early stage – get on the client's or bidders' vendor lists now.