Keelung MRT system & trackwork (15.6 km, 13 stations) – additional work to Xizhi–Donghu MRT, awarded to Gamuda–MiTAC JV
ترسية عقد – Taiwan
Rail systems, trackwork, traction power and signalling/telecom suppliers should approach the Gamuda–MiTAC JV for E&M packages on the Keelung MRT line.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Taiwan · Keelung / New Taipei |
| Client / owner | Department of Rapid Transit Systems, New Taipei City Government |
| Awarded to | Gamuda Bhd (72.84%) – MiTAC Information Technology (27.16%) JV |
| Value | MYR 3.7B |
| Announced | 14 Oct 2026 |
| Project type | Rail & metro |
Trades and packages needed
- Railway track & systems installation (main package)
- MV/HV substations & transmission lines (main package)
- ELV, ICT & security systems (CCTV, access, cabling) (main package)
- BMS, controls & SCADA (main package)
- Electrical installation (LV)
- Cables, switchgear & electrical materials
- Electrical & instrumentation (E&I) installation
- Mechanical erection & equipment installation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.