KenGen 100 MW / 100 MWh battery energy storage system at four sites (Olkaria, Kipevu, Embakasi, Muhoroni) – GCF USD 45M + IDA EUR 32.08M financing secured, design and tendering stage
تأهيل مسبق – Kenya
BESS integrators, EPC contractors and HV/substation suppliers should prepare for KenGen's upcoming World Bank/GCF-funded tender for 100 MW of storage across four power-plant sites.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Kenya · Olkaria / Kipevu / Embakasi / Muhoroni |
| Client / owner | Kenya Electricity Generating Company (KenGen) |
| Value | KES 10.5bn (~USD 80.7M) |
| Announced | 16 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
- Concrete works (in-situ)
- MEP & process design engineering
What to do
Early stage – get on the client's or bidders' vendor lists now.