Kentucky Power 769 MW gas combined-cycle plant at Big Sandy site plus new 765/345 kV Boyd County substation for TeraWulf Muskie data campus – PSC applications filed (cases 2026-00323/00324, COD Q2 2031)
تأهيل مسبق – United States
Power EPCs, gas-turbine/HRSG suppliers and HV substation contractors should position early for Kentucky Power's ~USD 2.85bn combined-cycle build tied to a 1 GW data campus.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | United States · Louisa (Lawrence County), Kentucky |
| Client / owner | Kentucky Power (AEP) |
| Value | USD 3.1bn (plant ~USD 2.85bn) |
| Announced | 17 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Electrical & instrumentation (E&I) installation (main package)
- MV/HV substations & transmission lines (main package)
- Concrete works (in-situ) (main package)
- Structural steel fabrication & erection (main package)
- Heavy lifting, rigging & transport (main package)
- Piling & deep foundations
- Pressure vessels, tanks & heat exchangers
- Industrial hot & cold insulation
- NDT, inspection & certification
- Scaffolding & access
- Cables, switchgear & electrical materials
- Equipment & crane rental
- Manpower supply
What to do
Early stage – get on the client's or bidders' vendor lists now.