2780 live leads · 55 new today · updated 19 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Ghana

Pre-qualification / EOI

Keta Commercial Port (Volta Region) – seven strategic investors shortlisted from 47 applicants; container, bulk and oil & gas terminals, possible shipyard

تأهيل مسبق – Ghana

Marine contractors, port designers and dredging firms should track the GPHA Keta port shortlist, as investors now finalise design studies and construction financing for a ~USD 600M first phase.

TypePre-qualification / EOI
StatusOpen – deadline not published
CountryGhana · Keta
Client / ownerGhana Ports and Harbours Authority (GPHA)
ValueUSD 600M
Announced10 Nov 2026
Project typePorts, harbours & marine works

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Pre-qualification / EOIEthiopiaOpen – closes 02 Dec 2026 (13 days)

Feasibility study and detailed design for Weito pumped small-scale irrigation scheme (100 ha), Kolango-Zuriya Woreda, ET-SE-RPCU-571071-CS-QCBS (World Bank EOI)

Client: Lowlands Livelihood Resilience Project, Phase Two (LLRP II) – South Ethiopia Irrigation and Lowlands Development Bureau

Pre-qualification / EOIEthiopiaOpen – closes 02 Dec 2026 (13 days)

Feasibility study and detailed design of 4 gravel access roads (~97 km) and 3 bridges (~130 m), South Ethiopia Region, ET-SE-RPCU-571226-CS-QCBS (World Bank EOI)

Client: Lowlands Livelihood Resilience Project, Phase Two (LLRP II) – South Ethiopia Irrigation and Lowlands Development Bureau

Open tenderOman · عُمانOpen – closes 07 Dec 2026 (18 days)

Omran tender 41/2026 – design & development consultancy for enhancement of the Al Hoota Cave destination (global, two-envelope)

Client: Omran Group (Oman Tourism Development Company)

Contract awardAustraliaContract awarded – subcontracting open

Geraldton Port Maximisation Project – main construction contract for next stage incl. new Berth 1 and tug jetty

Awarded to McConnell Dowell Constructors (Aust) Pty Ltd · Client: Geraldton Port Maximisation Project (Mid West Ports, per article photo credit)

Pre-qualification / EOIArmeniaOpen – closes 15 Dec 2026 (26 days)

Feasibility study, designs, bidding documents and technical supervision for irrigation systems (Kotayk, Lori, Arzni-Shamiram, Lower Hrazdan incl. Ranchpar pumping stations & pressure pipelines, Debetavan), AM-WC-CS-03/1 (World Bank EOI)

Client: Armenia Water and Irrigation Services Enhancement Program – Phase 1 – Water Committee, Ministry of Territorial Administration and Infrastructure

Want more leads like this?Get Marine works, dredging & reclamation, Structural & civil design opportunities in your inbox every morning.
Get free alerts →