King Salman International Airport Terminal 6 – roads, bridges and utilities civil infrastructure package (Road 539 upgrade, junction & T6 bridges, wet/dry utilities)
مطار الملك سلمان الدولي – حزمة البنية التحتية المدنية للصالة 6 (تطوير طريق 539 وجسور التقاطع والصالة والمرافق)
Road, bridge and utilities contractors with airport experience should bid KSIADC's Terminal 6 infrastructure package before 6 December 2026.
| Type | Open tender |
|---|---|
| Status | Open – closes 06 Dec 2026 (29 days) |
| Country | Saudi Arabia · Riyadh |
| Client / owner | King Salman International Airport Development Company (KSIADC) |
| Announced | 06 Nov 2026 |
| Deadline | 06 Dec 2026 |
| Project type | Airports, Roads & highways, Bridges & tunnels |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Bridge & flyover construction (main package)
- Water, sewer & utility networks (incl. HDD) (main package)
- Earthworks, excavation & site grading (main package)
- Storm-water drainage & culverts
- MV/HV substations & transmission lines
- Street, area & sports lighting
- ELV, ICT & security systems (CCTV, access, cabling)
- District cooling & chilled-water plants
- Ground improvement, grouting & shoring
- Precast & prestressed concrete
What to do
Register with the client and request the tender documents before the deadline.