KOC Jurassic Light Oil (JLO) export facilities – EPC of storage tanks, CMEI works & export network upgrade (42 months)
مشروع منشآت تصدير النفط الجوراسي الخفيف لشركة نفط الكويت – هندسة وتوريد وإنشاء خزانات التخزين وأعمال مدنية وميكانيكية وكهربائية وأجهزة وتحديث شبكة التصدير (42 شهراً)
LoA for a 42-month crude-export tank and CMEI package at KOC; tank fabricators, piping, E&I, coating and NDT subcontractors should approach Heisco now.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Kuwait · Ahmadi |
| Client / owner | Kuwait Oil Company (KOC) |
| Awarded to | Heavy Engineering Industries & Shipbuilding Co. (Heisco) |
| Value | KWD 111.05M (USD 359M) |
| Announced | 02 Oct 2026 |
| Project type | Oil, gas & petrochemical plants, Pipelines & utility networks |
Trades and packages needed
- Pressure vessels, tanks & heat exchangers (main package)
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Concrete works (in-situ)
- Industrial blasting, coating & painting
- NDT, inspection & certification
- Cathodic protection
- Scaffolding & access
- Pipes, valves & fittings supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.