Kosovo first wind power auction (100 MW) – Akuo Energy's 98 MW Čičavica wind farm lowest bid at EUR 75.94/MWh, named preferred winner
ترسية عقد – Kosovo
Kosovo's first wind auction picks Akuo's 98 MW Čičavica project – turbine foundation, access-road, crane/heavy-haul and substation contractors should position early; a second 200 MW round with IFC is being prepared.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Kosovo · Vushtrri |
| Client / owner | Ministry of Economy of Kosovo |
| Awarded to | Akuo Energy |
| Announced | 10 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Concrete works (in-situ) (main package)
- Heavy lifting, rigging & transport (main package)
- Roads, asphalt paving & road marking
- Earthworks, excavation & site grading
- Cables, switchgear & electrical materials
- Equipment & crane rental
- Land surveying & geotechnical investigation
- Mechanical erection & equipment installation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.